Chat now with support
Chat with Support

Metalogix Replicator 7.4 - Reference Guide

Reference Guide
Metalogix Replicator Documentation Replicator Central Administration Configure Web Application Manage Replication Groups Manage Replication Connections Manage Classifications Manage Map Families
Actions Configure Map Family Configure Replication Map Settings Manage Map Family
Monitor Replicator About Metalogix Replicator Site Settings

Manage Content Synchronization Jobs

The Manage Content Synchronization Jobs page allows users to manage scheduled queue jobs. This page is accessed by selecting Manage Content Sync Jobs on the Manage Map Family page.

Manage Content Synchronization jobs 2

Refer to the following table for information about the Manage Content Synchronization Jobs screen.

Parameter

Description

Web Application

Displaying jobs for the selected web application.

Run Selected Job Now

Prompts the selected synchronization job to run immediately.

Remove Selected Map Job

Removes the selected synchronization job.

Job Name

The Synchronization Job's name.

Type

The type of content synchronization being performed by this job.

Map Family Name

The parent map family name for which this job is being applied.

Map Name

The map name for which this job is being applied.

Status

The current status of the Synchronization Job.

Schedule

The type of schedule that has been configured for this synchronization job.

Next Scheduled

The date when the job is set to run next. Time shown in UTC.

Last Run

The last time the job was run. Time shown in UTC.

Sync Status

The current status of the synchronization job, only applicable for differential sync jobs.

Actions

Selection Edit Job will open the Configure Content Synchronization Job page for this specific job, allowing users to edit the job.

Report

Reports are only available for Differential Synchronization Jobs. Click Report will generate a report that can be used to see what the differences between the source and target are.

Content Synchronization Job Report

Content Synchronization Job Reports are only available for Differential Synchronization Jobs. They are accessed on the Manage Content Synchronization page, by clicking the Report link found next to the differential content sync job.

content sync job report 2

Parameter

Description

Job Name

The name of the Content Sync Job.

Map Name

The name of the map the replication connections are part of.

Select Replication Connection

This drop down allows you to select the replication connection within this map that you wish to compare.

Number of differences

The number of differences found between the source and target website.

Sync Status

The status of the sync.

List table

This table provides an overview of the list and folders web site that contain the differences. Clicking on View Report, will open a secondary table.

Content Table

This table becomes available when you click View Report next to an item in the List table (above). Here the items within the list/folder that are different are listed, along with their sync status before and after synchronization, as well as the action performed during the content synchronization job.

Actions

Specific configurations, which can be different for each Replication Map within a Map Family, are specified using one of the action links. You can access the action links by selecting the (...) button next to a Map Family name.

manage map family7

 

Configure Map Settings

The Configure Map Settings link opens the Configure Replication Map settings page. Certain configuration options, such as the specification of which events are replicated, are not available when configuring child maps, as they have been inherited from the parent map.

Related Documents