You can cancel an active job from the Job Status page.
1 |
In the Navigation pane, click Job Status. |
The Plug-in for FileSystem lets you stop a job at any point and resume it later from the same point. To have this ability, you must configure the job as restartable.
For more information about restartable jobs, see the Quest NetVault Backup Plug-in for FileSystem User’s Guide.
When you stop the job, the plug-in generates an index for all items that have been processed up to that point and writes the index to the backup media and NetVault Database. The job status is then set to Job Stopped. If the plug-in is writing a large backup index, the jobs status continues to be reported as “Writing to Media: Storing Backup Index” until the index is written. When you restart the job later, the plug-in runs an Incremental Backup job to back up the remaining files and folders.
1 |
In the Navigation pane, click Job Status. |
The Restart method lets you resume a backup from the point the job was stopped. To have this ability, you must configure the job as restartable.
The following plug-ins support this feature:
• |
Plug-in for FileSystem: The Plug-in for FileSystem allows you to stop a backup job at any point and resume it later from the same point. To have this ability, you must configure the backup option Enable Restartable Backup for the job. For more information about this option, see the Quest NetVault Backup Plug-in for FileSystem User’s Guide. When you stop the job, the plug-in generates an index for all items that have been processed up to that point and sets the job status to Job Stopped. When you restart the job later, the plug-in runs an Incremental Backup job to back up the remaining files and folders. |
• |
Plug-in for VMware: The Plug-in for VMware allows you to restart a job to back up only those virtual machines that failed previously. To have this ability, you must configure the backup option Enable Restartable backups for the job. For more information about this option, see the Quest NetVault Backup Plug-in for VMware User’s Guide. When a restartable backup completes with some failed virtual machines, the plug-in generates an index for the completed virtual machines and sets the job status to Job Stopped. When you restart a job, the plug-in runs an Incremental Backup job to back up the failed virtual machines. |
1 |
In the Navigation pane, click Job Status. |
1 |
In the Navigation pane, click Job Status. |
2 |
In the list of jobs, select the job, and click Hold Schedule. |
NOTE: If you restart NetVault Backup, a job on hold remains in the same state, but it is rescheduled to run at its next scheduled time. If the job cannot be rescheduled because it was scheduled to run once and this time has now elapsed, the job status is set to Did not Run. Warning messages are generated in the NetVault Backup Logs that describe why the job did not run. |
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Términos de uso Privacidad Cookie Preference Center