1 |
2 |
3 |
In the Repository Replication Configuration pane, find the Repository Name column, and select the applicable repository. |
4 |
Select Schedule repository synchronization. |
a |
Start: In the drop-down list, select the time for the replication task to begin. |
b |
Recurrence Pattern: Establish how often the changes should be synchronized. There are five options within this section: |
• |
Daily: The daily option can be scheduled to synchronize the repository every weekday or every x number of days. |
• |
Weekly: Repository synchronization can be configured to run on weekly intervals, from every week to every 99 weeks. The day of the week on which to run synchronization tasks can be configured. |
• |
Monthly: The monthly option offers the following configurations: |
• |
• |
• |
Yearly: The yearly option offers the following configurations: |
• |
Every [m] [x]: |
• |
• |
Interval: The interval option lets you select the number of days, hours, and minutes that should pass between synchronization jobs. The interval selected must be greater than or equal to five minutes. |
6 |
Click OK to schedule the job. |
1 |
In the My Repositories pane, right-click the source or replication repository, and select Synchronize. |
• |
From the Tools menu on the vRanger toolbar, select Options. Under the Repositories node, select Replication. |
• |
Right-click the replication repository, and select Repository Replication Options. |
2 |
Clear the check box for Enable savepoint replication for a successful backup job task or Schedule repository synchronization, or both. |
3 |
Click OK. |
1 |
2 |
Click OK. |
3 |
5 |
6 |
When vRanger detects that the repository being added contains savepoint data and displays the Warning: Existing Repository Found dialog box, click Import to reconfigure the repository as a primary repository. |
© ALL RIGHTS RESERVED. Términos de uso Privacidad Cookie Preference Center