Setting the recurrence schedule
To set the recurrence schedule:
1 On the Recurrence Schedule Selection page, select from the options described in the following table.
There is no need to define a schedule. The job runs on demand.
• Daily: The daily option can be scheduled to run the report every weekday or every x number of days.
• Weekly: vRanger can be configured to run on weekly intervals, from every week to every 99 weeks. The day of the week on which to run reports can be configured.
• Monthly: The monthly option offers the following configurations:
▪x can be any value from 1 to 31. This value determines the day of the month on which the job occurs.
y can be any value from 1 to 99. This value determines the monthly interval — for example, every two months sets the job to run every other month.
▪f can be either: first, second, third, fourth or last.
d can be: weekday, weekend day, Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, or Saturday.
y can be any value from 1 to 99. This value determines the monthly interval — for example, every two months sets the report to run every other month.
• Yearly: The yearly option offers the following configurations:
▪ Every [m] [x]:m is any month of the year. This value determines the month of the year in which the report occurs.
x can be any value from 1 to 31. This value determines the day of the month on which the report occurs.
▪f can be either: first, second, third, fourth, or last.
d can be: day, weekday, weekend day, Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, or Saturday.
m is any month of the year. This value determines the month of the year in which the report occurs.
• Interval: The interval option lets you select the number of days, hours, and minutes that should pass between backup jobs.Select the starting date and ending date:
• No end date: The job recurs until it is stopped.
• End after: Select the number of occurrences.
• End by: Select the date by which to end the recurrence.
2 Click Next.
Configuring email notifications
To add or edit email addresses, see Setting up the SMTP server.
To configure email notifications:
1 On the Email Notification Selection page, in the Selected column, select the address to which notifications should be sent.
2 Click Next.
Starting the backup job
The final page in the Backup Wizard displays a summary of the selections you made for the job.
To start the backup job:
1 On the Summary page, review the data displayed in the tree view.
2 If you want to automatically begin the job immediately after completing the wizard, select Run the Job after Finish is clicked.
3 Click Finish.
b
c
5
Restore
The vRanger restore process
If you are restoring a VMware® VM, be aware of the following regarding the destination that you target for a restore:
Full restore
Using vRanger, recovery of an entire virtual machine (VM) — or resource pool, VMware vSphere® vApp(s)™, and so on — is a simple process. A full restore returns the protected objects to the state as of the point in time at which the backup was performed. If the savepoint is for a differential backup, the restore process first restores the matched full backup, and then merges the data from the selected differential archive. For incremental savepoints, the full backup is restored along with each incremental archive taken between the full and the selected savepoint.