Chatee ahora con Soporte
Chat con el soporte

SQL Navigator for Oracle 7.4 - Installation Notes

Windows Tab

(Only for Oracle 10g release or later)

Assign resource plans to activate at different times such as during specific peak or off-peak periods.

Button Description

New

Click to create a window

  1. Enter a Window Name
  2. Select a Resource Plan from the drop-down list
  3. Select a Priority from the drop-down list
  4. Select a Schedule to attach to run during the window as appropriate
  5. Select the Duration (days, hours, months) for the window
  6. Specify a start date/time and end date/time for the window
  7. Select a repeat interval if desired

Click Save.

The new window will appear in the Windows list above.

Click Enabled to activate the window.

Save Save changes to a selected window or a new window.
Advanced Edit available Attribute Values for the selected item.
Open Activate the selected Window and commence running the scheduled jobs based on the durations currently entered. You can change the duration values if required.
Close Stop the currently active window. Any jobs using that window as their schedule which were started at the beginning of this window and have indicated that they must be stopped on closing of the window will be stopped.
Drop Remove the selected item from the database.
Documentos relacionados

The document was helpful.

Seleccionar calificación

I easily found the information I needed.

Seleccionar calificación