Is there a Work Item Association option in the TFS provider in Team Coding?
I currently use a tool called TFS MSSCCI Provider for TFS 2005. I get a window prompt at the end of the check-in step that has an ability called “Work Item”. With this I can associate a work item (such as a task) to the check-in and associate the change with a TFS task.
Is there something in Toad that can do this with the TFS Provider built into Toad for Oracle?
This was implemented in Toad for Oracle 12.6. The latest version of Toad for Oracle can be downloaded here.