I was running multiple reorg jobs, T-Lock, each having approx. 1000 tables in each reorg script. Because of an issue with our tape management system not being able to offload our database offline redo logs, I had to cancel these multiple reorg jobs. Once the out TMS was back operational, I restarted the cancelled scripts up again.
Now that all the reorg jobs either finished successfully or terminated (as 3 did), I'm getting the following errors. The multiple reorg jobs were reorging tables grouped alphabetically (tables starting with N% in 1 reorg script, M% in another, O% in another etc., in my attempt to reorg all the tables out from the same tablespace and reorg them all into the same, new tablespace.