When attempting to run an exchange cluster backup using NetVault Plug-in for Exchange version 12.0 and 12.1, the job fails after transferring all data to device.
The log error show:
"Proxy Master on DAG member server 'node name' died unexpectedly".
This has been recognized as Bug DNPE-745 for plugin for Exchange.
It relates to the size of the messages sent to the proxy. NetVault NetWork Manager has a threshold to limit the size of the messages. Because the message is over the limit, they are being dropped and the message channel is being closed.
WORKAROUND:
The threshold can be increased by editing the NetVault Configuration file "nvnmgr.cfg"
[Network:Message Validation Threshold]
Value=33554432
Please note that the stanza might not exist, and might have to be added to the file. Default value if not set is 8MB as threshold.
STATUS:
This bug will be fixed in a future release of Plugin for Exchange
© ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center