How to run a backup or restore job by creating an event
For more information on this topic, please see the Administration Module 2-Basic Operation of NetVault Backup-Web-based Training
On occasions it is desirable to run a second backup job or a restore on completion of a backup job.
This can be done by raising an event using the advanced option tab and this event can be setup to run an already configured backup or restore job.
1. On backup advanced option tab, select raise event if job is successful, give the event a name and save
2. open global notification, open job user defined. In here we should see the event you just created open this and open run a job. In here we put the backup or restore job number, select the run a job option and save.
Example :
JOBID=<backup/restore job ID you wish to run>
select the run a job option and save.
Note: Also see Administrators Guide page 209 onwards if you require further information on notifications and events.
URL to Admin Guide:
http://us-downloads.quest.com/Repository/support.quest.com/NetVault%20Backup/9.0/Documentation/Quest_NetVault_Backup_9.0_Administrators_Guide_English.pdf