지금 지원 담당자와 채팅
지원 담당자와 채팅

NetVault Plug-in for NDMP 11.4 - Application Notes for Mirapoint Message Server

Backing up data

About Backup Dump Levels

The Plug‑in for NDMP supports both Full and Incremental Backups. The backup type is determined by the Dump Level that can be set to Level 0 for a Full Backup or Levels 1 through 9 for Incremental Backups:

Level 0 or Full Backup: A Full Backup provides a backup of all the data in the selected path.
Level 1 through 9 or Incremental Backup: The Incremental Backups base themselves on the most recent lower‑level Incremental Backup, and include any data that has changed or is new since the last Full or Incremental Backup.

Backing up data using the plug-in

1
In the Navigation pane, click Guided Configuration, and then on the NetVault Configuration Wizard page, click Create Backup Jobs.
2
In Job Name, specify a name for the job.
3
Next to the Selections list, click Create New.
4
On the NetVault Backup Selections page, open the NetVault Backup Server, and then open NDMP Client.
5
Select the applicable filer, and in the Actions list, click Enter Backup Path.
6
In the NDMP Backup Request dialog box, configure the following option:
Directory: The Mirapoint Message Server only supports the backup of all mailboxes. Type the full path to the mailbox store (for example, /usr/store). The backup fails if you specify any other path.
Dump Level: Select the type of backup that you want to perform. For a Full Backup, type or select 0. For an Incremental Backup, type or select any level from 1 to 9, based on the previous dump level.
Save File Information: This option allows you to restore individual files and directories included in the backup. If you clear this check box, the plug-in does not allow you to perform granular restore of the items included in the backup. Quest recommends that you leave this check box selected.
Update: With this option selected, the appropriate dump file is updated to reflect the Incremental Backup sequence after a successful backup. For example, if Dump Level 3 backup is performed, this file is updated to indicate the point in time the backup occurred, so that Dump Level 4 knows where to begin its backup.
For more information about these sets, see the Quest NetVault Backup Administrator’s Guide.
9
To submit the job for scheduling, click Save & Submit. You can monitor the job progress from the Job Status page and view the logs from the View Logs page.
To save the job definition without scheduling it, click Save. You can view, edit, or run this job from the Manage Job Definitions page. This job is not displayed on the Job Status page until you submit it.
For more information about Job Status, View Logs, and Manage Job Definitions, see the Quest NetVault Backup Administrator’s Guide.

Restoring data

관련 문서

The document was helpful.

평가 결과 선택

I easily found the information I needed.

평가 결과 선택