This topic introduces the schedule command usage:
|
NOTE: If you specify a command without supplying the expected value or option, you will be prompted to provide the correct value or option. |
Displays any existing Cleaner schedule.
schedule --show [--cleaner][--replication][--cloudreplication][--name <name>]
Where
--cleaner Displays the cleaner schedule. --replication Displays all configured replication schedule(s). --cloudreplication Displays all configured cloud replication schedule(s). --name Display replication/cloud replication schedule of a specific container.
Cleaner Schedule: Start Stop Sunday 05:00 06:00 Monday 05:00 06:00 Tuesday 05:00 06:00 Wednesday 05:00 06:00 Thursday 05:00 06:00 Friday 05:00 06:00 Saturday 05:00 06:00
Creates a new Cleaner or Replication schedule for a QoreStor instance.
|
NOTE: Without any Cleaner schedule set, the QoreStor Cleaner process automatically starts within two minutes after it detects that no data ingest operation or other system operation activity is present. So, if your QoreStor runs intermittent or inconsistent ingest or readback, or replication operations, there is no need to set a Cleaner schedule (it will automatically run during periods of low or non-activity). However, if your system runs regular and consistent ingest or readback you should create a Cleaner schedule that runs only during a known period of low or non-activity (for example, on a day or time period sufficient to complete this process). If your system does not meet either of these cases, you can still manually run the Cleaner. For more information, see maintenance --filesystem [--reclaim_space]. |
schedule --add --day <Day of the week (Sunday|Monday...)> [--cleaner] [--replication] [--cloudreplication] [--start_time <HH:MM>] [--stop_time <HH:MM>] [--name <name>]
Where
--day Day of the week to add. --cleaner Set up a cleaner schedule. --replication Set up a replication schedule. --cloudreplication Set up a cloud replication schedule. --start_time Schedule start time in HH:MM format, 00:00 - 23:59 are valid values. To disable or continue from previous day, use -:- for start time. --stop_time Schedule stop time in HH:MM format, 00:01 - 24:00 are valid values. To continue to next day, use -:- for stop time. --name Replication source Container Name.
|
NOTE: Set a corresponding stop time for every start time in each Cleaner (or Replication) schedule you create. The following example shows setting up a Cleaner schedule for the remainder of the week (Monday through Saturday). |
|
NOTE: Do not select 00:00 for a start time or stop time endpoint for midnight when setting Cleaner or Replication schedules (instead, use either the 23:55 or 00:05 value). |
Successfully updated Cleaner schedule.
|
NOTE: To create a Replication schedule (use the QoreStor CLI --replication command), and the same process shown here to schedule the start and stop times for a Replication schedule. This lets you schedule start and stop times for each day in the week in which you want the Replication process to run. |
Deletes a day in an existing Cleaner or Replication schedule for a QoreStor instance. The --name option is only applicable for replication and not for the cleaner. You can use it to specify a container.
|
NOTE: To delete days from either an existing Cleaner or Replication schedule, specify the day in the week and the schedule type. |
schedule --delete --day <Day of the week (Sunday|Monday...)> [--cleaner] [--name <name>] [--replication] [--cloudreplication]
Where
--day Day of the schedule to delete. --cleaner Delete a cleaner schedule. --name Replication source Container Name. --replication Delete a specific replication source container's schedule. --cloudreplication Delete a specific cloud replication source container's schedule.
Successfully updated Cleaner schedule.