NDMP backup completes successfully but the backup gives a warning message such as one of the following:
DUMP: Total Dir to FH time spent is greater than 15 percent of phase 3 total time. Please verify the settings of backup application and the network connectivity.
Or
The control connection is established on 192.168.40.17 which is hosted on port e0M. This is a low bandwidth port and might impact performance.
You need to be signed in and under a current maintenance contract to view premium knowledge articles.
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center