Either a schedule, used by a report, has reached the end time or the Next Scheduled Time is N/A.
When the referring schedule for a scheduled report is invalid, then the value of "upcoming scheduled report" is not correct.
STATUS: Change Request WCF-15780 has been fixed in the FMS version 5.7.5.7. Click here to download the version.
Workaround: Delete any disabled scheduled reports which are linked to an invalid schedule.