The Active Directory object synchronization process is as follows:
1 |
On the Scheduling page, select the Use Active Directory access scheduling check box. |
2 |
The maximum number of synchronized directory objects should be coordinated with the following:
© ALL RIGHTS RESERVED. Términos de uso Privacidad Cookie Preference Center