Access the Oracle Job Scheduler.
A job assigns a task to a schedule. The job tells the schedule which tasks - either one-time tasks created "on the fly," or predefined programs - to run. A specific program can be assigned to one, multiple, or no schedule(s); likewise, a schedule may be connected to one, multiple, or no program(s).
Tab | Description | Oracle |
---|---|---|
Check the status and settings of existing jobs. Create, run, schedule, edit and remove jobs. |
All Oracle releases | |
Programs Tab | Define or select programs to be executed. | Oracle 10g release or later |
Schedules Tab | Define the frequency with which the Scheduler will execute a particular set of tasks. | Oracle 10g release or later |
Windows Tab | Define time windows during which resource plans will be activated. | Oracle 10g release or later |
Window Groups Tab | Create a named group with containing windows with similar scheduling properties for ease of management | Oracle 10g release or later |
Job Classes Tab | Group together jobs that have similar resource demands into job classes to ensure best utilization of resources. | Oracle 10g release or later |
Job Log Tab | Show the current status and information about jobs over a specified date range or by owner. | Oracle 10g release or later |
Window Log Tab | Show the current status and information about Windows over a specified date range. | Oracle 10g release or later |
© ALL RIGHTS RESERVED. 使用条款 隐私 Cookie Preference Center