There are two ways to access the Execution Plan History dialog:
• |
From History by selecting the statement or batch and by clicking Analyze in the top of the table. |
The execution plan dashboard displays the following content.
Resolving Date — Displays all the execution date and time of the selected statement.
Type — Displays the type of the execution plan.
Plan Hash Value — Displays the plan hash value of the execution plan
The execution plan contains 3 tabs:
By clicking the Generate Plan button the execution plan is generated and can be viewed. By clicking on the Compare Plan button a pop up will appear that allows comparing all available execution plans of the selected SQL statement.
Compare can be accessed from the Performance tree.
The upper panes graphically displays the Workload or any other selected resource.
Use the Oracle Activity drilldown to carry out the operations described in the following topics:
• |
• |
• |
• |
• |
• |
© ALL RIGHTS RESERVED. 使用条款 隐私 Cookie Preference Center