立即与支持人员聊天
与支持团队交流

NetVault 12.4 - Administration Guide

Introduction Getting started Configuring clients Managing catalog search Configuring storage devices
About storage devices SAN considerations Quest DR Series systems Quest QoreStor NetVault SmartDisk EMC Data Domain Systems Snapshot Array Manager Virtual Tape Libraries Virtual standalone drives Shared Virtual Tape Libraries Physical tape devices Storage tiers
Backing up data Managing policies Restoring data Managing NetVault Backup dashboard Managing jobs Monitoring logs Managing storage devices
Role-based access to manage storage devices Monitoring device activity Managing disk-based storage devices in list view Managing disk-based storage devices in tree view Managing the Snapshot Array Manager Managing tape libraries in list view Managing tape libraries in tree view Managing tape drives in list view Managing tape drives in tree view Adding shared devices
Managing storage media Managing user and group accounts Monitoring events and configuring notifications Reporting in NetVault Backup Working with client clusters Configuring default settings for NetVault Backup
About configuring default settings Configuring encryption settings Configuring plug-in options Configuring default settings for post-scripts Configuring default settings for Verify Plug-in Configuring Deployment Manager Settings Configuring Job Manager settings Configuring Logging Daemon settings Configuring Media Manager settings Configuring Network Manager settings Configuring Process Manager settings Configuring RAS device settings Configuring Schedule Manager settings Configuring Web Service settings Configuring Auditor Daemon settings Configuring firewall settings Configuring general settings Configuring security settings Synchronizing NetVault Time Configuring the reporting utility Configuring NetVault Backup WebUI default settings Configuring NetVault Backup to use a specific VSS provider Configuring default settings using Txtconfig
Diagnostic tracing Managing diagnostic data Using the deviceconfig utility NetVault Backup processes Environment variables Network ports used by NetVault Backup Troubleshooting
Common errors Safe Mode in NetVault Backup

Configuring Deployment Manager Settings

This section includes the following topics:

About Deployment Manager

The Deployment Manager process (nvdeploymentmgr) runs on the NetVault Backup Server. This process manages the push installation tasks.

You can use the push installation method to perform the following tasks:

For more information about the push installation method, see Installing software from WebUI (push installation).

You can modify the Deployment Manager settings from the Change Settings page.

Configuring default settings for Deployment Manager

2
On the NetVault Server Settings page, under Services, click Deployment Manager. In the Deployment Manager dialog box, configure the following settings.

Maximum simultaneously active deployment processes on server

By default, 50 concurrent deployment processes can run on the server.

To change the number of deployments that can be run in parallel at any time, type or select the new value.

Maximum time a deployment task should wait when processing a client

This setting determines the amount of time the Deployment Manager waits for a response from a remote client during the client addition phase.

The default value is 300 seconds. The timeout interval can be between 30 and 900 seconds.

Skip Remote Machine Cleanup

This setting lets users change the behavior of client-side log cleanup. By default, it skips cleanup on the remove target machine.

3
Click Apply to apply the new setting and close the dialog box.

Configuring Job Manager settings

This section includes the following topics:

相关文档

The document was helpful.

选择评级

I easily found the information I needed.

选择评级