How to remove Advanced Load Balancing and Link Failover Configuration from the Data Domain System
1 Make sure that no jobs are active from vRanger to the Data Domain system. You can do this
from the Data Domain system by checking the status of existing connections in the interface
group with the following command:
# ddboost ifgroup show connections
2 Ensure that there are no pending jobs from any of the connected backup servers to this
system.
3 Disable the feature on the Data Domain system:
# ddboost ifgroup disable
4 Reset the interface group:
# ddboost ifgroup reset
All the interfaces are released from the group. However, backup servers can still access the DD Boost storage server on the Data Domain system on the interface registered with vRanger. In the example above, the Data Domain system is still registered with vRanger using 192.168.1.1
© ALL RIGHTS RESERVED. Feedback Terms of Use Privacy Cookie Preference Center