How to edit the Replication schedule from the GUI?
1. Log into the DR Web console
2. On System Configuration click on the arrow and select schedules
3. Inside the Schedules page, click on the 3 menu dots located upper right corner and a menu will display
4. Select Add Multiple Replications
5. Under Add Multiple replications heading there is a Set events to container dropdown
6. Click on the dropdown arrow and a list of the containers that are configured for replications should appear and select the desired one for scheduling
7. A schedule template should appear. Configure the times for replication, ensure there is an even number of stop and start times.
8. Click save and the configurations are saved.
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Feedback 이용 약관 개인정보 보호정책 Cookie Preference Center