Tchater maintenant avec le support
Tchattez avec un ingénieur du support

vRanger 7.8.6 - Integration Guide for EMC Data Domain Boost (DD Boost)

Managing repository replication

vRanger supports repository replication. Repositories configured for replication can be synchronized in one of three ways:

Configuring a repository for automatic replication

When a managed repository is configured for savepoint replication, and a backup task completes successfully, each savepoint is also replicated to the replication repository.

1
From the Tools menu on the vRanger toolbar, select Options.
2
Under the Repositories node, select Replication.
TIP: You may also right-click the target repository in the My Repositories pane, and select Repository Replication Options.
3
Select Enable savepoint replication for a successful backup job task, and click Ok.

Scheduling repository synchronization

When using scheduled repository synchronization, savepoints are replicated to the replication repository according to a configured schedule.

1
From the Tools menu on the vRanger toolbar, select Options.
2
Under the Repositories node, select Replication.
3
In the Repository Replication Configuration pane, find the Repository Name column, and select the applicable repository.
4
Select Schedule repository synchronization.
a
Start: In the drop-down list, select the time for the replication task to begin.
b
Recurrence Pattern: Establish how often the changes should be synchronized. There are five options within this section:
Daily: The daily option can be scheduled to synchronize the repository every weekday or every x number of days.
Weekly: Repository synchronization can be configured to run on weekly intervals, from every week to every 99 weeks. The day of the week on which to run synchronization tasks can be configured.
Monthly: The monthly option offers the following configurations:
Day [x] of every [y] month:
x can be any value from 1 to 31. This value determines the day of the month on which the synchronization job occurs.
y can be any value from 1 to 99. This value determines the monthly interval — for example, every two months sets the job to run every other month.
The [f] [d] of every [y] month(s):
f can be either: first, second, third, fourth or last.
d can be: weekday, weekend day, Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, or Saturday.
y can be any value from 1 to 99. This value determines the monthly interval — for example, every two months sets the synchronization task to run every other month.
Yearly: The yearly option offers the following configurations:
Every [m] [x]:
m is any month of the year. This value determines the month of the year in which the synchronization occurs.
x can be any value from 1 to 31. This value determines the day of the month on which the synchronization occurs.
The [f] [d] of [m]:
f can be either: first, second, third, fourth, or last.
d can be: day, weekday, weekend day, Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, or Saturday.
m is any month of the year. This value determines the month of the year in which the synchronization occurs.
Interval: The interval option lets you select the number of days, hours, and minutes that should pass between synchronization jobs. The interval selected must be greater than or equal to five minutes.
6
Click OK to schedule the job.

Synchronizing a repository manually

1
In the My Repositories pane, right-click the source or replication repository, and select Synchronize.
Documents connexes

The document was helpful.

Sélectionner une évaluation

I easily found the information I needed.

Sélectionner une évaluation