Tchater maintenant avec le support
Tchattez avec un ingénieur du support

Rapid Recovery 6.7 - User Guide

Introduction to Rapid Recovery The Core Console Repositories Core settings Protecting machines
About protecting machines with Rapid Recovery Understanding the Rapid Recovery Agent software installer Deploying Agent to multiple machines simultaneously from the Core Console Using the Deploy Agent Software Wizard to deploy to one or more machines Modifying deploy settings Understanding protection schedules Protecting a machine About protecting multiple machines Enabling application support Settings and functions for protected Exchange servers Settings and functions for protected SQL servers
Managing protected machines Snapshots and recovery points Managing privacy Encryption Authentication Replication Events Reporting VM export Restoring data Bare metal restore
About bare metal restore Differences in bare metal restore for Windows and Linux machines Understanding boot CD creation for Windows machines Managing a Linux boot image Performing a bare metal restore using the Restore Machine Wizard Using the Universal Recovery Console for a BMR Performing a bare metal restore for Linux machines Verifying a bare metal restore
Managing aging data Archiving Cloud accounts Core Console references REST APIs Glossary

Viewing running tasks from any Core Console page

To complete this procedure, there must be a task currently running on the Rapid Recovery Core.

Rapid Recovery Core offers a quick way to view tasks that are currently running on the Core from any page of the Core Console.

On the right side of the button bar is the Running tasks queue. In lower screen resolutions, or if the browser window is not fully expanded, the queue appears as an Events [Running Tasks] icon. When one or more tasks are running, a number indicating the number of tasks currently running on the Core appears next to the queue, and the icon becomes animated. You can click the queue to reveal a drop-down list of running tasks and complete the actions described in the following procedure.

  1. On the Core Console, while a task is running, click [Running Tasks] Running tasks.
    A small box appears, showing the type of tasks running and their progress, and presents options for canceling one or more of the tasks or for seeing more details.
  2. To cancel one or more of the running tasks, complete one of the following options:
    • To cancel a single task, click the X beside the task description.
    • To cancel all running tasks, click Cancel All.
  3. To view more details about a running task, click the task description.
    The Monitor Active Task window opens and displays details such as progress and start time.

For more information, see the following related tasks:

Suspending or resuming scheduled tasks

To resume the Core scheduler, it must first be paused, as described in step 3.

The Core tracks tasks based on a schedule. Transfers for backup, replication, and archiving can all be scheduled; reports can be generated weekly or monthly; and so on. When the time comes for a scheduled task to occur, the job is placed in a queue, and jobs are accomplished consecutively or concurrently, based on priority. This feature is known as the Core scheduler.

Users can now notify the Core to suspend the scheduler. When suspended, future jobs that otherwise would be scheduled automatically to run on the Core are held temporarily in a queue, and no new tasks are scheduled. This function is useful in situations such as performing OS updates, software installations, or maintenance on the Core server. When suspended, jobs accumulate in the queue but do not start until the Core scheduler function is explicitly resumed. In the interim, a banner is displayed across the Core Console indicating that the Core scheduler is paused.

NOTE: This feature prevents tasks that would soon be scheduled from running. To view or cancel tasks that are already queued without suspending future tasks, see the topic Viewing running tasks from any Core Console page.

Complete the following steps to suspend or resume the Core scheduler function.

  1. Navigate to the Rapid Recovery Core Console.
  2. On the icon bar, click [Running Tasks] (Events).
    The Tasks page is displayed.
  3. To suspend the Core scheduler function, do the following:
    1. Click [Suspend] 
      Suspend Scheduler.
    2. In the dialog box, if you want to cancel all running tasks and suspend future tasks, select Cancel Active Tasks and Suspend.
    3. To suspend future tasks only, click Suspend.
    Tasks are suspended, and a banner is displayed on all pages of the Core Console notifying you that all scheduled tasks are suspended.
  4. To resume suspended tasks, from the Tasks page, click [Suspend] 
    Resume Scheduler.

NOTE: When the scheduler is suspended, you can also click Resume at the top of the Core Console.

 

For more information, see the following related tasks:

Viewing alerts

An alert is a priority notification of an event. Any event for which you specifically requested notification appears in the list of alerts, along with errors, warnings, or important informational messages.

Rapid Recovery Core ships with a default set of events that are prioritized as alerts. You can customize the events which appear as alerts by editing the default notification group (or by setting up a new notification group). In addition to these events appearing on the Alerts page, you can change the methods used to notify you by changing your notification options. For more information on changing the events that appear as alerts, or changing notification options, see the topic Understanding event notifications in Rapid Recovery.

Complete the following steps to view alerts specifically for the Rapid Recovery Core, or to view alerts associated with a specific machine.

  1. To view alerts for the Rapid Recovery Core, from the icon bar, click [Events] 
    (Events). Click on the drop-down [Events] 
    menu to the right of the Tasks page title, and select Alerts.

    If you want to view alerts for a specific protected machine, navigate to the Summary page of the specified machine, click the Events menu, and then click Alerts.

    The list of events is filtered to display only important alerts for the Core or for the machine you selected.
  2. Optionally, to filter the list of important alerts by start date, end date, alert message description, or any combination, do the following:
    1. To filter by alert category (errors, informational messages, or warnings), click the [status dropdown menu] 
      status drop-down menu, and select the status condition or conditions. Alert category filter options include [errors] 
      errors, [info] 
      informational messages, and [warning] 
      warnings, or any combination of the three.
    2. To filter by start date and time, enter the starting date and time using one of the following options:
      • In the From text box, type the date and time in format MM/DD/YYYY HH:MM AM/PM. For example, to search from the first day of January in 2016 at 8:00 AM, enter 1/1/2016 8:00 AM.
      • To select the current data and time, click the [Calendar] 
        Calendar widget in the From text box and then click the current date. The current time automatically appears.
      • Click the [Calendar] 
        Calendar widget, select the date, then click the [Clock] 
        Clock widget and select the desired time using the controls. Click away from the calendar to accept the selected changes.
    3. To filter by alert message description, enter the description in the Search message text box.
      For example, to see alerts only related to agents, enter "agent," or to see alerts related to transfers, enter "transfer;" and so on.
    4. To further refine the list of alerts that appears, you can also define an end date and time in the same format.

      The list of alerts is immediately filtered based on the criteria you selected.

  3. Optionally, if you want to remove all alerts, click Dismiss All.

For more information, see the following related tasks:

Viewing a journal of all logged events

The journal lists all logged events. This list is comprehensive, including both job- and non-job-related events. It includes specific events for which you requested notification. The journal also lists passive events and status events from the Core, the license portal, and so on.

NOTE: If your environment is set to use repetition reduction, some repeated events may not be logged each time the event occurs. For more information about this feature, see About repetition reduction.

Complete the following steps to view a journal of all events for the Rapid Recovery Core, or to view a journal of all events for a specific machine.

  1. To view a journal of all events logged for the Rapid Recovery Core, from the icon bar, click [Events] 
    (Events). Click on the drop-down [Events] 
    menu to the right of the Tasks page title, and select Journal.

    If you want to view a journal of all events for a specific protected machine, then navigate to the Summary page of the specified machine, click the Events menu, and then click Journal.

  2. Optionally, to filter the list of all events by start date, end date, alert message description, or any combination, do the following:
    1. To filter by event category (errors, informational messages, or warnings), click the [status dropdown menu] 
      status drop-down menu, and select the status condition or conditions. Event category filter options include [errors] 
      errors, [info] 
      informational messages, and [warning] 
      warnings, or any combination of the three.
    2. To filter by start date and time, enter the starting date and time using one of the following options:
      • In the From text box, type the date and time in format MM/DD/YYYY HH:MM AM/PM. For example, to search from the first day of January in 2016 at 8:00 AM, enter 1/1/2016 8:00 AM.
      • To select the current data and time, click the [Calendar] 
        Calendar widget in the From text box and then click the current date. The current time automatically appears.
      • Click the [Calendar] 
        Calendar widget, select the date, then click the [Clock] 
        Clock widget and select the desired time using the controls. Click away from the calendar to accept the selected changes.
    3. To filter by alert message description, enter the description in the Search message text box.
      For example, to see alerts only related to agents, enter "agent;' to see alerts related to transfers, enter "transfer."
    4. To further refine the list of events that appears, you can also define an end date and time in the same format.

      The list of events is immediately filtered based on the criteria you selected.

For more information, see the following related tasks:

Documents connexes

The document was helpful.

Sélectionner une évaluation

I easily found the information I needed.

Sélectionner une évaluation