The actions bar at the top of the Capacity Management tab contains the following options, Settings Menu, Recalculating Results, and See Environment Model in Capacity Director.
Click the Settings icon on the actions bar to open the Settings dialog box. For details about the settings that you can configure in this dialog, see the “Configuring Analysis”.
The Settings menu > Analysis tab allows you to configure the settings to be taken into calculation by Foglight Capacity Director Lite for analyzing the current capacity and resource utilization, and for predicting future resource requirements.
• |
Baseline For Forecasting: Defines the historical period used for the calculations of metric views, current capacity, and recommended resources in the Resource Utilization view. The following options are available: 30 Days Trending (default option), 180 Days Trending, and 365 Days Trending. |
• |
Time Frame: Defines the predicted period for calculating metric views, current capacity, and recommended resources in the Resource Utilization view. The following options are available: Next 30 Days (default option), Next 60 Days, Next 90 Days, and Next 180 Days. |
• |
Average Analysis Period: Defines the historical period used for the calculations of: |
• |
Show Getting Started (Use Cases): Select this check box to show the Getting Started tab, or clear this check box to hide the Getting Started tab. |
3 |
Click Save. |
Foglight Capacity Director Lite allows you to get the latest analytical results for the Current Capacity view and the Resource Utilization view, based on the data collected by the VMware Performance Agents. To get the latest analytic results, click the Recalculate menu on the actions bar, and click Recalculate in the Recalculate Confirmation dialog box.
NOTE: Results populated in Current Capacity > Clusters, Resource Utilization > Clusters, Resource Utilization > Hosts and Workload are impacted if the High Availability (HA) policy is enabled in the vCenter®. |
The Recalculation Results dialog box includes the following recalculating results:
• |
Current Capacity: Capacity of the vCenter® or datacenter, average/maximum slot size for clusters, available slots, and constraint. |
• |
Resource Utilization: History data and forecasting data. |