When backing up 2 NetApp volumes in a NDMP job, 1 volume succeeds but the 2nd volume will fail.
This can happen if there are 2 child process backing up to VTL with 1 drive.
Backing up both volumes as separate jobs launched one by one will be successful.
Messages that may be visible here are:
- Check the Mover status and logs as a failure to transition to the Listen state for the Mover may cause this failure.
- Backup of '/vol/vol_XXXX' failed