When a discovery runs, the process is as follows:
2 |
Click Run. |
• |
Next Run: The next run of the discovery. This is calculated based on the discovery’s schedule. |
• |
• |
Last Run Status: The results of the last run of the discovery - whether it finished, finished but was unable to collect all of the data, or was canceled. |
• |
Last Run: When the discovery last completed. This will be empty until the first successful completion of the discovery. |
• |
Last Run Time: How long the most recent run of the discovery took to complete. This time is measured from the time the discovery is submitted to the server until the last task finishes running. |
• |
Average Run Time: The average of the Last Run Time of the 10 most recent runs of the discovery. Only runs with a Last Run Status of Finished or Finished with failures are included. |
• |
Error Suppressions: Indicates when errors have been suppressed for a discovery. |
You can use any of the following options to change the grouping:
• |
Click on any column header to change the sorting within the grouping. For example, if grouping by discovery type, click the Last Run Time header to sort by last run time within each type of discovery. |
To clear the grouping, right-click in the grouping area just above the column headers and select Clear Grouping.
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center