Use the Performance Modeling Configuration options to:
To set the Performance Modeling Configuration options
Option | Description |
---|---|
Prediction Time-Spans |
Specify how far you want to look into the future. Note: Because each prediction is based only on the existing raw data, the forecast becomes less accurate the further you look into the future. |
Prediction Limits |
When the Performance Modeling metric increases at an increasing rate (follows an exponential trend), its value may ultimately grow so large that the prediction becomes meaningless. Use the Default Performance Modeling prediction Limit Multiplier option to define a realistic upper limit on predicted values. Beyond this point, the predicted growth will be ignored. By default, the upper limit is set at 100 times the largest actual value observed. |
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center