CT got the following error:
"System call error: Resource temporarily unavailable udp client socket [sp_cop/3274]
Error: process +PN+*+sp_cnc+0xac1658ce couldn't be launched [sp_cop/3274]"
Not enough resources.
Check if the following kernel parameters are set high enough:
nproc
maxuprc
If there is enough swapspace setup and some memory free, the SA needs to look at some OS logs for more information on this error.
Most likely SA needs to increase the value of nproc kernel parameter through sam and reboot the server if this happens again.