Date: Mar 2010
Product & Version: NetVault All
OS Version: All
Module & Version:
Application version:
Symptoms:
Duplications were setup correctly using the "Immediate" option rather than using "Repeating", but some duplications were successful and some weren't.
Make sure that the NVDB Backup is not scheduled to run in between Phase 1 and 2 backups, as the NVDB backup locks the NVDB and therefore cannot retrieve the backup information in order to perform the Phase 2 Duplication.
NVDB Backups should be scheduled to run when no other backups and restores are running (daily if possible).
SFDC solution number:
English version available ID 5510
Version française disponible ID
Deutsche Version verfügbar ID
© ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center