For an individual Metalogix Content Matrix Console instance, you can Change the Managed Metadata Migration Batch Size, and/or Configure Settings for Migrations Using the Import Pipeline.
How many threads can be used simultaneously per job in Metalogix Content Matrix is controlled by the Edit Resource Utilization Settings option, which is accessible from the Settings ribbon at the top of the Console UI.
If the option is clicked, a dialog containing a slider will appear that will allow control of the number of threads available within a single action. If the slider is moved all the way to the left, this will turn off multithreading and only allow a single thread to be used during the action. (For more information on threading, refer to the Microsoft article About Processes and Threads.)
NOTE: Turning off multithreading in this way can be a valuable way of troubleshooting whether multithreading is causing issues.
If the slider is left in the middle, it will allow twice the number of processors in threads to be created per action. For example, if the machine running Metalogix Content Matrix has a two core CPU, four threads will be able to be used if the slider is in the below state:
Moving the slider farther to the right will allow more threads to be used, but can potentially overwhelm system resources. This could lead to potential errors if the system resources cannot handle the data being migrated. There is a chance that if the speed is too high, you would see a slowdown in the overall migration, because the migration is trying to run actions faster than the resources properly allow.
While this value can be set through the Content Matrix Console, you can also set it through the back end, if the UI setting does not seem to be working for you. Please contact Quest Support for more information on this back end setting.
This section answers some of the most frequently asked questions about using Metalogix Content Matrix.
Question
Are there any keyboard shortcuts in the Metalogix Content Matrix Console? If so, what are they?
Answer
Yes, there are a few basic keyboard shortcuts within the Metalogix Content Matrix Console. They are:
·Ctrl + A - This will Select All items within the Items view or in any of the logging sections (such as the Job List section or the Log Viewer).
·Ctrl + C - This will Copy any selected item(s) within Explorer view or Item view, including sites and lists. It will also copy any selected item(s) or information within the logging sections (such as the Job List section or the Log Viewer).
·Ctrl + V - This will Paste any selected item(s) within Explorer view or Item view, including sites and lists. It will also paste any selected item(s) or information within the logging sections (such as the Job List section or the Log Viewer).
·Delete - This will Delete any selected item(s). This applies to all views and items within Metalogix Content Matrix.
·Ctrl + P - This will open the Properties dialog for any selected item in Metalogix Content Matrix, in both the Explorer view and the Items view.
·Ctrl + S - This will open the Save dialog for the current Job list.
·F2 key - This will Rename any selected job list in the Job List in the main UI. Simply select the desired job list, in the Job List section, press F2, and type in the new name for the job list.
·F5 key - This will Refresh any selected node in the Explorer View. This is the same as using the Refresh node option in the context (right-click) menu.