1 |
Use the Schedule, Target Storage, and Advanced Options lists to configure any additional required options. |
2 |
TIP: To run a job that you have already created and saved, select Manage Job Definitions in the Navigation pane, select the applicable job, and click Run Now. |
This process includes the steps outlined in the following topics:
Verify that the following prerequisites are met:
• |
If you do not intend to use the Rename feature, Quest recommends that you delete the original VM before you perform recovery. |
• |
If you do not intend to use the Rename feature and you do not intend to delete the original VM, ensure that the VM is turned off. Also ensure that none of its files are open before you perform recovery. The plug-in’s recovery process overwrites the existing VM, and write-access is required. |