The Reports tab allows you to create, copy, and edit reports created from predefined templates. This tab provides the following sections:
• |
• |
1 |
Click Create New Report. |
• |
Edit—displays the Edit-time Range dialog. |
• |
Time Range Type—sets the time range type. |
• |
Unit—sets the unit of the time range (Year, Month, Week, Day, Hour, Minute, Second). |
• |
Number—sets the time range length. |
• |
Granularity—sets the granularity level of the time range, for example 5 minutes. |
• |
Change to Null—changes the time range to a null value. |
5 |
Click Next. |
• |
Scheduled Report—name assigned to the report. |
• |
Report—report template chosen in the previous dialog. |
• |
Schedule—when the report runs. |
• |
Retained—the number of reports retained. |
• |
Enabled—enables the report to run on its selected schedule. |
• |
Report—allows you to select a report format: PDF, Excel, or XML. |
• |
Email—email addresses are separated by a comma; do not use semi-colons. To receive the reports in email, configure the email server parameters in the Administration dashboard (Administration > Setup & Support > Email Configuration). |
6 |
Click Finish. |
1 |
Click Copy Existing Report. |
3 |
Click Next. |
4 |
Click Finish. |
This view allows you to edit report settings, for example report schedule or format.
1 |
Click Edit Existing Report. |
3 |
Click Next. |
5 |
Click Finish. |
The Recent Report History table lists all of the the most recently run reports.
2 |
Select the default viewing application or select Other to view the report in another application. |
3 |
Click OK. |
This section displays tooltip help topics on the creation of capacity management reports.
© 2024 Quest Software Inc. ALL RIGHTS RESERVED. Conditions d’utilisation Confidentialité Cookie Preference Center