サポートと今すぐチャット
サポートとのチャット

Toad Data Studio 1.0 - Installation Guide

Bind Fields

Use the Field List to view the structure of the query used to generate the report. You can also customize the location and way that the data displays in the report by binding a field to a new Label control, or by binding a field to an existing control.

To bind a field

» Drag a field onto a report band or existing control. You can also bind a field already in the report by dragging the control on it.

 

Related Topics

About Designing Toad Data Reports 

関連ドキュメント

The document was helpful.

評価を選択

I easily found the information I needed.

評価を選択