立即与支持人员聊天
与支持团队交流

NetVault 13.0.3 - Administration Guide

Introduction Getting started Configuring clients Managing catalog search Configuring storage devices
About storage devices SAN considerations Quest DR Series systems Quest QoreStor NetVault SmartDisk EMC Data Domain Systems Snapshot Array Manager Virtual Tape Libraries Virtual standalone drives Shared Virtual Tape Libraries Physical tape devices Storage tiers
Backing up data Managing policies Restoring data Managing NetVault dashboard Managing jobs Monitoring logs Managing storage devices
Monitoring device activity Managing disk-based storage devices in list view Managing disk-based storage devices in tree view Managing the Snapshot Array Manager Managing tape libraries in list view Managing tape libraries in tree view Managing tape drives in list view Managing tape drives in tree view Adding shared devices
Managing storage media Managing user and group accounts Monitoring events and configuring notifications Reporting in NetVault Working with client clusters Configuring default settings for NetVault
About configuring default settings Configuring encryption settings Configuring plug-in options Configuring default settings for post-scripts Configuring default settings for Verify Plug-in Configuring Deployment Manager Settings Configuring Job Manager settings Configuring Logging Daemon settings Configuring Media Manager settings Configuring Network Manager settings Configuring Process Manager settings Configuring RAS device settings Configuring Schedule Manager settings Configuring Web Service settings Configuring Auditor Daemon settings Configuring firewall settings Configuring general settings Configuring security settings Synchronizing NetVault Time Configuring default settings for global notification methods Configuring the reporting utility Configuring NetVault WebUI default settings Configuring NetVault to use a specific VSS provider Configuring default settings using Txtconfig
Diagnostic tracing Managing diagnostic data Using the deviceconfig utility NetVault processes Environment variables Network ports used by NetVault Troubleshooting
Common errors
NetVault Service fails to start on Windows NetVault Service fails to start after the machine is restarted NetVault Service starts, but stops immediately on Linux Login fails after any change in the server IP address Unexpected behavior of NetVault WebUI WebUI does not run in Compatibility View in Internet Explorer NetVault installer fails during push installation VSS-based backup fails Modifying TCP/IP socket buffer size on Windows Restores using Data Copy savesets fail on clients running NetVault 10.0.1 Restore fails on Itanium platforms if the index is larger than 2GB After upgrade, Data Copy and Consolidated backup job on Linux fails After upgrade, console error is displayed on WebUI pages Deployment task hangs on target Linux machine during push installation. Unable to add package store with hostname. Deployment task fails due to network configuration issues. Domain user is unable to login NetVault Server if the workstation attribute is set. Domain user is unable to login NetVault Server on Debian 9. Adding the target machine as a client fails, after successful push installation. Unable to install, uninstall or navigate catalog search page after manually uninstalling NetVault Client Host. Unable to install, uninstall catalog search on client after NetVault Server migration with the same or different server name External Azure AD user cannot add an external Azure AD user to NetVault Server Failed to verify target Windows machine from a Linux-based NetVault Server NetVault is unable to send reports as an email attachment in PDF format on RHEL 5.x platform Restore fails on NetVault Database backup When using RDA for backups, only four streams are used at once Unable to create large VTL on Linux Browsing a folder with a large number of files times out
Safe Mode in NetVault

Viewing job calendar

You can view your jobs for a month, a week, or a day on a calendar. It can be helpful to view your jobs in the calendar format to ensure that there are no scheduling conflicts. You may want to verify the calendar before you create a job. You can monitor the progress and status of your jobs from the Job Calendar page. You can also use this page to manage your jobs and perform various job-related tasks.

2
On the Job Calendar page, you can view the following information.

Settings icon

Click this icon to display the job calendar settings. ‘Calendar settings’ drawer is displayed on the right- side of the page showing the following options:

Filter By Status: This area shows the following filter options based on the job status:
Scheduled: To display the scheduled jobs, click this button.
Active: To display the in-progress jobs, click this button.
Success: To display the jobs that have completed successfully, click this button.
Warnings: To display the jobs that have completed with warnings, click this button.
Errors: To display the jobs that have failed, click this button.
Timeslot Size: For Weekly and Daily view, you can set the time granularity for the jobs on calendar using Timeslot Size field.

Job Calendar

This area displays the jobs on the calendar based on Filter By Status and Timeslot Size settings.

You can view your jobs for a month, a week, or a day on calendar. By default, weekly view of the Job Calendar is displayed. To display monthly view, click ‘month’ or to display the daily view, click ‘day’.

Monthly view: Displays the jobs for the month. The height of the job is fixed in this view.

Weekly view: Displays the jobs for a week. The height of the job is corresponding to the time taken to run the job.

Daily view: Displays the jobs for a day. The height of the job is corresponding to the time taken to run the job.

The Red color line on the Job Calendar shows the current time.

Move the pointer over a job to see the job summary such as job title, start time, end time, and so on.

Managing jobs

This section includes the following topics:

Running a job immediately

You can use the Run Now method run an existing job immediately.

1
In the Navigation pane, click Job Status or Manage Job Definitions.

If a backup job includes Phase 2 jobs, selecting Phase 1 runs both Phase 1 and Phase 2 jobs. Phase 1 runs immediately, and when it completes successfully, Phase 2 is scheduled to run as per the job definition.

Aborting a job

You can cancel an active job from the Job Status page.

相关文档

The document was helpful.

选择评级

I easily found the information I needed.

选择评级