Complete the steps in this procedure to schedule a report.
1. |
2. |
The Job Report page appears. A downward-facing arrow appears to the right of the current report name.
3. |
5. |
On the Configuration page of the wizard, enter the details for the report you want to schedule, and then click Next. The configuration options are described in the following table. |
6. |
On the Destination page of the wizard, select a destination for the reports you want to schedule. You must choose one of the following, and may select both. When satisfied, click Next. |
◦ |
In the Send to email addresses field, enter one or more valid email addresses to notify users by email message when a scheduled report is generated. |
◦ |
Select Save as file to save the generated report files to a location you specify, and in the Location type drop-down menu, select a local, network, or cloud storage option. Then, in the Location field, specify additional location information as described in the following table. |
8. |
On the Schedule page of the wizard, from the Send data menu, select an option to determine how frequently to generate the report that you specified. You can generate reports daily, weekly, or monthly. Each option has its own parameters, as described in the following table. |
9. |
Optionally, on the Schedule page of the wizard, if you want to prevent the scheduled report from generating until you resume paused reports, select Initially pause reporting. |
If you want this report to generate as scheduled, clear this option.
10. |
The new report schedule appears in the Summary Reports summary table.
Complete the steps in this procedure to modify parameters for a scheduled report.
1. |
2. |
The Job Report page appears. A downward-facing arrow appears to the right of the current report name.
3. |
5. |
6. |
Complete the steps in this procedure to pause, resume, or delete a schedule for a report.
1. |
Navigate to the Rapid Recovery Core Console. |
2. |
The Job Report page appears. A downward facing arrow appears to the right of the current report name.
3. |
The Scheduled Reports page appears.
The Download button exports the generated report in the format type selected in the Export menu. |
If you are not satisfied with the appearance of a generated or exported report, you can change the font used in the reports. For more information, see Managing report settings.
Once a report is generated, you can use the reports toolbar.
© 2023 Quest Software Inc. ALL RIGHTS RESERVED. Feedback Terms of Use Privacy