Once created activities can be executed in several different ways.

Run Now

Any activity or activity group can be run on demand.run_activity_history

STEP 1.  Select an activity/group from the Activity View.

STEP 2.  Select Run image178 from the Ribbon or Action à Run Activity/Group from the right-click menu.

STEP 3.  The Run Activity History screen will be generated. Enter a comment into the provided interface and click the Run Now button to initiate the activity.

 

Run Now Using CSV

change_manager_csv_fileOccasionally the same activity needs to be run repeatedly against multiple targets and sources. There are two ways to accomplish this in Change Manager. The activity may be run immediately with a user created .csv spreadsheet. This functionality is described here.

Alternatively the spreadsheet may be incorporated directly into the Activity. This functionality is discussed in the Running an Activity for Different Source and Target Sites section.

The spreadsheet can consist of one or two columns specifying the URLs for sites. If two columns are used, the application will assume that the first column contains the source site and the second the target site.

STEP 1.  Select an activity/group from the Activity View.

STEP 2.  Select Run Using CSV image182 from the Ribbon or from the right-click menu.

STEP 3. change_manager_load_site_urlsThe Load Site URLs screen will be generated. Enter a valid file location.

STEP 4.  The sites inside the CSV will be shown here. Check-off the rows containing sites that should be included.

STEP 5.  Click Check Connection button to verify that connectivity exists for all the selected sites.

STEP 6.  If a single column of  URLs is loaded, you must also select whether the loaded list should be used for source or target sites.

STEP 7.  Press Next to continue

STEP 8.  The Run Activity History screen will be generated. Enter a comment into the provided interface and click the Run Now button to initiate the activity.

 

Run Using Scheduler

All activities and groups can be scheduled to run once, daily, weekly, etc. Scheduling can be configured when an activity is created or at any time afterwards using the Properties window. Any activity with an associated schedule will be run automatically unless the application is closed down.

 