The Logged Errors Report:
·reports ControlPoint application errors for a specified time period, and
·is available from the ControlPoint Actions and Analyses panel.
To generate a Logged Errors Report:
1From the Manage ControlPoint panel, choose Schedule Management and Logging > Logged Errors Report.
2Enter the Start Date and End Date for the time period you want to cover.
Now you can:
·run the analysis immediately (by clicking [Run Now] )
OR
·schedule the analysis to run at a later time
OR
·generate an xml file with instructions that can be run at a later time (by clicking [Save Instructions]). See Saving, Modifying and Running Instructions for a ControlPoint Operation.
The errors returned by this report are similar to those recorded in the Administration log, which is available to ControlPoint Application Administrators. It does not, however, trace activities like the progress of both scheduled and interactive Discovery jobs, as the Administration log does.
© 2025 Quest Software Inc. ALL RIGHTS RESERVED. Terms of Use Privacy Cookie Preference Center