By default, up to five scheduled jobs can run at any one time. For example, if three scheduled jobs are running at the time the ControlPoint scheduler task next checks the queue for pending jobs, an additional two jobs will be submitted.
ControlPoint Application Administrators can change this number by updating the Value of the ControlPoint Setting Maximum Number of Scheduled Jobs to Submit at One Time.
For example:
·You may want to increase this number if jobs are generally scheduled to run when system usage is low, to allow more of them to run concurrently.
·You may want to decrease this number if interactive performance of your farm is being affected by the processing of scheduled jobs.
This setting can be used in conjunction with Number of Minutes Scheduler Will Wait Before Next Group of Jobs (OVERIDESCHEDULETIMERMINUTES) to fine-tune the behavior of the ControlPoint scheduler.