The Discovery Report provides details about each environment to assist with migration planning.
After the initial discovery jobs are complete, the environment discovery report is available for viewing. To view the report, follow these steps.
The Migration History Report provides details about all or selected projects.
To view the report, follow these steps.
How to Convert Existing Groups
To manually run Discovery and adjust the Discovery Delta Timestamp,
Click the drop-down menu located in the top left corner.
![]()
Click the Discovery link from menu.
- Hover over the desired tenant environment.
Click RUN DISCOVERY to begin the process.
![]()
In the pop-up window displayed, adjust the Delta Timestamp via the date time control text box.
![]()
To manually disable all future discoveries, follow these steps.
Click the drop-down menu located in the top left corner.
![]()
Click the Discovery link from menu.
- Hover over the desired tenant environment.
Click DISABLE to stop all future the processes.
![]()
Authorized project users and administrators may go to the following URL to access reports for all their projects.
https://power365.quest.com/Reports
You may also click the Reports action in the dashboard menu. The default report is the discovery report. Additional reports can be selected from the dropdown menu in reports.
© ALL RIGHTS RESERVED. Feedback Terms of Use Privacy