The project to upgrade the version of tools from PT8.53 to PT8.55. At first, we will move the STATACM from 5.7.2 to version 5.8 so that the version of tools 8.55 will be taken into STATACM. We would go through this method for passing environment gradually as the version of tools from PT8.53 to PT8.55 and we have questions:
1. Confirm you this method?
2. An existing CSR of the 5.7.2 STATACM version and already migrated in PT8.53, can it be migrated after the update of the 5.8 STATACM version to the PT8.53 base towards the PT8.55 base?
3. CSR created after upgrade 5.8 STATACM in PT8.53, can it be migrated to a PT8.53 base towards a PT8.55 base?
© ALL RIGHTS RESERVED. Feedback Terms of Use Privacy Cookie Preference Center