I have a client that has 14 DBs on their path. Not all of the environments are available all of the time. When I read in a project of 10 objects, and 10 of those DBs are down, then the developer gets 100 messages about environments being unavailable.
WORKAROUND:
Download Stat 5.6.2 Hotfix for Solution SOL95605 & SOL95606 (Stat562HF-b.zip) from here.
STATUS:
Issued is fixed with Stat 5.6.2 HF-b.
This hotfix has addressed two issues:
1. Adding Objects for Inactive/Unavailable Objects cycles through over and over
2. Performance on Project Sync wizard has deteriorated