Workspace migrations are the final part of the Power BI migration and will migrate the supported contents of the following:
- Shared workspaces
- Reports and Symantec Models
- Workspace permissions
For Workspaces that contain Reports based on directly imported data, there are no additional steps required to perform the migration.
For Workspaces that contain Reports based on active connections to on premises source data systems there are steps that are required prior to migrating a Workspace. These would be the Gateway Mapping and the Connection Migration. If these steps are not completed prior to migrating a Workspace then the migration will fail. Connections that are used by Reports can be checked in the Power BI Portal by opening the Workspace and checking the Semantic Model.
Workspace migrations are also dependent on the OBM Power BI access group being granted access to the Workspace. This can be verified in the Power BI Portal by checking the Workspace access.
Note: It is recommended to map all Gateways that would be in scope for Workspace migration as a first step in a migration project. Following this Connections can be migrated for any Workspaces that would be in scope for migration. These items will not impact end users and can be prepared in advance of a Workspace migration.