Date: OCT 2008
Affected NV Version: NVBU 8
OS Version: All
Plugin version: N/A
Application version: N/A
Description: Breakdown, of "Pre and Post Script Execution Logic
If Pre-Script result = Success & NetVault Backup = Success & Post Script = Success. ***Job Will Complete Successfully***
If Pre-Script result = Success & NetVault Backup = Success & Post Script = "FAIL". ***Job will complete, but a Post Script error will be reported***
If Pre-Script result = Success & NetVault Backup = "FAIL" & Post Script = Success. ***Job will fail, but the Post script will run and an error will be reported.
If Pre-Script result = "FAIL" & NetVault Backup = "WILL NOT RUN", Post Script = "WILL NOT RUN" ***Job will fail and a Pre Script error will be reported***
This table displays the execution order (Pre Script to NetVault Job to Post Script) and the result of each, depending on the result of the previous.
Errors listed in the table above, will be displayed in the NetVault "Job Status" section of the Status window, in the Status area of Job Management.
***Pre_Post Script Logic.xls - attached to Solution***