If a scheduled backup or restore job is saved with a set that is subsequently deleted, the job will fail.
For more information on this topic, please see the Administration Module 2-Basic Operation of NetVault Backup-Web-based Training
There are three ways to fix the scheduled jobs in the event that a saved set is deleted.
1 - Recreate the set with exactly the same name
2 - Edit the job manually and create or load a new set
3 - Restore the “Schedule Manager” component of a NetVault Database backup taken prior to set’s deletion. This is the most disruptive option, as all data in the Schedule Manager component will be restored to that point. NetVault services need to be restarted after the restore completes.