Chat now with support
サポートとのチャット

Migration Manager for Email Archives 9.7 - Release Notes

Release Notes

These release notes provide information about the Quest® Migration Manager for Email Archives 9.7 release.

Topics:

About this release

Migration Manager for Email Archives 9.7 is a major release with enhanced features and functionality. See New features and Enhancements for details. These notes can also be found on the Quest Support Portal at https://support.quest.com.

IMPORTANT: Special considerations might be necessary when upgrading large item databases. TLS 1.0 is required when running the Migration Manager for Email Archives installer and can be removed after the installation is complete.

New features

The items below were added to Migration Manager for Email Archives 9.7:

Metalogix Archive Manager as a source is now supported.

78353

The module installer was enhanced to support the installation of a Metalogix Export Module.

79048

UI and SQL database changes were made to support Metalogix Archive Manager as a source.

78352

6 PowerShell commands were updated to extend support to Metalogix Archive Manager as a source.

78351

Enhancements

During migrations from Enterprise Vault to Enterprise Vault, folders are now handled more appropriately.

81816

A tenant can now be set to “sleep mode” via PowerShell. When enabled (it’s disabled by default), sleep mode stops processing of tasks and requests from modules.

82265

Import folder assignment behavior for Journal Explosion mappings was enhanced. Naming policies will be assigned to Journal Explosion users/leavers by default, after the user/leaver is added. Here are the default policies:

Active Users (Default): Naming policy for JE Users. Items will be ingested to the Recoverable/Purges folder.
Leavers (Default): Naming policy for JE Leavers. Items will be ingested into the Journal Items folder.

81100

Several PowerShell scripts related to Journal Explosion processes were optimized.

76913

When using Journal Explosion, the handling of too long or not valid email addresses was enhanced. Long addresses (more than 64 characters before the @) are marked as not valid. Additionally, validation was added to JE Token creation, JE Grouping, and Adding Leavers via UI and CSV.

79299

Various enhancements were made to the Failed Items page to improve performance and usability.

58471

Release history

The items below were added to Migration Manager for Email Archives 9.6:

When using Journal Explosion, it’s now possible to manually map to single target mailbox.

79281

The user interface and SQL were adjusted to support a new source that will be introduced in a future release.

77775

When using Journal Explosion, the Time to expire inactive items setting can now be disabled by entering 0.

77488

During Journal Explosion, if a user’s primarySMTPaddress was changed during (or before) ingestion, they’re now handled successfully. On the JE Users Management page, they’re marked as having an invalid address. Then, a new Fix Invalid SMTP Addresses button can be used to resolve the issue.

58347

PST files are now verified upon completion, before they’re moved to the PST file target location. A PST file is considered “verified” when they can be opened (showing they’re not corrupt) and the count of ingested items in the target PST is as expected.

62939

The Native Format Import (NFI) module now ingests items in processes, rather than threads.

75408

A new module and commands were created to support a new source that will be introduced in a future release.

77776

Adjustments were made to Migration Manager for Email Archives Core to support a new source that will be introduced in a future release.

77795

PST as a source is no longer supported for Journal Explosion.

78602

For Journal Explosion to PST migrations, mapping ownerless users to an original smtp address is now supported.

71521

Two new PowerShell commands are available to support finalization of JE leavers.

74211

Modules that use EWS now support OAuth/modern authentication.

56199

Microsoft EWS API version 2.2 is now used and Exchange import module trace entry text was enhanced.

74771

56175

The database upgrade process was enhanced for better selection of upgrade scripts for execution.

75287

Several development components were updated. For example, LLBLGen was updated to version 5.5.3 (DB) and DevExpress was updated to version 19.1.4 (UI).

NOTE: Please note, requirements have changed for modules. Check your .net compatibility before installing Migration Manager for Email Archives 9.6. Special considerations might be necessary when upgrading large item databases. For upgrade instructions and in case of any doubts contact Quest Support at https://support.quest.com.

Performance and handling of queuing of Journal Explosion items for ingest was improved. It is disabled by default.

56203

On the Journal Explosion Leavers Management page, performance was improved of the Enable for Import, Merge Leavers, and Merge Leavers by Preview actions.

78962

The triggering and execution of the Retry Failed Items action from the Failed Items report was enhanced.

74768

セルフ・サービス・ツール
ナレッジベース
通知および警告
製品別サポート
ソフトウェアのダウンロード
技術文書
ユーザーフォーラム
ビデオチュートリアル
お問い合わせ
ライセンスアシスタンス の取得
Technical Support
すべて表示
関連ドキュメント