This article explains what the requirements are for migrating from Archive Manager to a target environment, and then covers the basic steps that should be followed to start such a migration.

Topics:

Requirements

The following is a list of requirements.

The Archive Manager module should be installed on an appropriate server.

The appropriate modules should be installed on each appropriate target server involved in the migration.

An AD Collector module should be installed so that it can collect user-level information for the migration project.

One or more staging areas should be setup, of an appropriate size and should be excluded from virus scanners.

The Stage 2 workflows should be reviewed, and if necessary, customized to meet the needs of the project.

It is best practice to find an appropriate failed item threshold for the project/customer and apply that at the links level. This way all mappings which are created will inherit this value.

Basic Steps

The following are the basic steps to start this type of migration.

SCREEN: Modules

All Migration Manager for Email Archives modules must be enabled, and optionally a schedule for them defined. It is important to verify that none of the modules have a red background (indicating that Migration Manager for Email Archives Core has not had contact with the module) and that the module versions are as expected.

SCREEN: Active Directory

Select and enable one or more domains for synchronization.

SCREEN: Archive Manager Environment

Add a new Archive Manager environment, specifying the following:

Finally indicate that you want to ‘Create Item Database’, an ‘Enable Archive Collection’. The ‘Link SQL Server’ should be set to the server where the Migration Manager for Email Archives Item databases are hosted.

SCREEN: Links

Select the newly created link, and map a Shortcut Process Module to it.

SCREEN: Links

Ensure that the link for the migration target is added, and modules associated with it.

SCREEN: Links

Ensure that the Default Staging Area is configured correctly. Depending on the migration, the free space, and the number of vault stores being used as the source for the migration, the ‘high water mark’ can be adjusted upwards.

SCREEN: Bulk Mapping

One or more containers can now be mapped and migration can begin. It is often easiest to use a filter on the bulk mapping screen to show only Archive Manager as a source.

General Considerations

The following general considerations should be taken into account for this type of migration: